Column tributary area
Definition
The floor area whose load is carried by a given column. Adding floors or placing heavy equipment increases the load on existing columns; if the columns were not designed for this additional demand, the tributary area analysis will reveal the overload.
Related terms
- Carbonation depth
- The depth to which CO2 has penetrated concrete and neutralised its alkalinity, destroying the protective environment around embedded steel and initiating corrosion....
- Disproportionate collapse
- Collapse extent that is far greater than would be expected from the triggering event. Ronan Point is the canonical example: a small...
- Lift-slab construction
- A method in which floor slabs are cast at ground level and hydraulically jacked up steel columns to their final position. The...
- Post-tensioned slab
- A concrete slab in which steel tendons running through plastic ducts are tensioned after the concrete hardens, improving span capacity. Corrosion of...
- Punching shear
- A failure mode in which a concentrated load punches through a concrete slab around its bearing perimeter. It can occur at a...
Explained in
- Case Studies: Building CollapsesThe floor area whose load is carried by a given column. Adding floors or placing heavy equipment increases the load on existing columns; if the columns were no...